Search to Merch
Women's Curved Basketball Shoes With Thick Soles
Women's Curved Basketball Shoes With Thick Soles
Shipping included, on all Canadian orders!
Couldn't load pickup availability
Women's Curved Basketball Shoes With Thick Soles
Curved basketball shoes with shock-absorbent, anti-slip rubber soles, with eyelet & lace closure, for bold style and athletic performance
The basketball colored theme, camouflages a basketball against the shoes while dribbling, visually confusing opponents for a competitive advantage
Ideal for daily outdoor wear in spring, summer, autumn and daily indoor wear in all seasons
Care Instruction: Spot clean only
Size Guide
| inch | Foot Length | 8.9 | 9.1 | 9.4 | 9.6 | 9.9 | 10.2 | 10.5 | 10.6 | 10.9 |
| cm | 22.5 | 23.1 | 23.8 | 24.4 | 25.1 | 25.9 | 26.6 | 27 | 27.8 | |
| EURsize | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | |
| US Size | 5 | 6 | 7 | 7.5 | 8 | 9 | 10 | 11 | 12 | |
| Product measurements may vary by up to 3~5mm | ||||||||||
How to measure:
Standing on a blank paper, mark the ends of your heels and tips of your longest toes. Measure the length between the two markings with a ruler
Find your foot length and corresponding shoe size in the above size guide. If your foot length is between two values, please choose the larger size
